Blog

Insights from clearspan

Structural engineering guides, design examples, and insights to help you build with confidence.

Featured

Timeline comparison showing traditional beam engineering at 2-3 weeks versus Clearspan at approximately 3 days
Thursday, April 9, 2026
The traditional beam engineering process takes about 2-3 weeks from first call to stamped deliverables. Here's where all that time goes, and how clearspan compresses it to just days without cutting corners on code compliance.
clearspan
Beam loading diagram for a 2x6 Douglas Fir-Larch rafter with dead and live roof loads over a 13.5 ft span
Monday, April 6, 2026
Complete NDS wood beam design example: adjustment factors, bending, shear, deflection, and bearing checks for a 2x6 Douglas Fir-Larch rafter. Compared against Breyer Example 6.18.
clearspan
clearspan

How Long Does Engineering Take for a Beam?

The traditional beam engineering process takes about 2-3 weeks from first call to stamped deliverables. Here's where all that time goes, and how clearspan compresses it to just days without cutting corners on code compliance.

clearspan

Wood Beam Design Example using clearspan

Step-by-step walkthrough: run the Breyer 6.18 beam from the NDS verification example through clearspan's beam design wizard.

clearspan

Wood Beam Design Example: NDS Bending, Shear, and Deflection Checks (Breyer 6.18)

Complete NDS wood beam design example: adjustment factors, bending, shear, deflection, and bearing checks for a 2x6 Douglas Fir-Larch rafter. Compared against Breyer Example 6.18.