Skip to main content

AI that shows its work

Clearspan gives AI real calculation tools. Every run is saved as a live calc you can open, check, and edit.

Looking for a beam design? See the contractor experience →

What can I help you with today?
Ask

Delegate

Hand off the calc.

Give AI engineering tasks using the web app, sending an email, or from Claude on your desktop/phone. The AI model can use clearspan's tested engineering tools, the same ones you would use yourself. The AI does not need to do its own math.

Explore the clearspan MCP →

Same tools you use

Review

Open the live calc.

Every calculation the AI runs is saved as a live file in your workspace, not a chat transcript. Open it, review the inputs, change a parameter and rerun it. You stay the engineer of record.

Edit anything, rerun instantly
clearspan

Wood Beam Capacity

#412
Save changes
NDS beam capacity check · 1 caseSaved from chat
Result
PASS
Bending DCR
0.61
Shear DCR
0.34
Deflection
0.93
Recompute
Section & service conditions
Span
13.5ft
Section
2x6
Species
Douglas Fir-Larch
Grade
No. 1 & Btr
Load cases
CaseBending DCRShear DCRStatus
D + Lr0.610.34Pass

Privacy

Your projects stay yours.

Project redaction strips client names and project identity before anything reaches the model. The AI sees a beam, not your business.

Identity stays on your side
clearspan
Project settings · AI privacy
Johnson Residence
214 Elm St, Sacramento
Hide this project's identity from AI assistants
AI codename:drifting-trussCopy
agent chatRedacted
Check the roof rafter on drifting-truss and update the calc.
Running the rafter check for drifting-truss now. The saved span is 13'-6" at 16" o.c.

Calculation tools

Built for engineers first.

Every tool functions the same for you as it does for the AI. Run calculations and generate reports yourself, with or without the agent.

Beam analysis.
Performs simple span beam analysis to determine demands, deflections, and reactions. Manage custom load patterns, combinations, and linked loads between beams.
Wood design.
NDS wood beam and post checks with clear results. Steel beams, columns, and other materials are coming soon.
Report compiler.
Bundle calcs into a report pdf package with cover sheets, a live table of contents, and sections.

Inbound work

Leads that already did their homework.

Receive residential referrals from the client platform and the Find an Engineer search.

New project request intake.
Contractors and architects can use clearspan to provide information for simple beam designs. Give your team an advantage by having the more information available on new project requests.
Free firm listing.
Every clearspan firm & team account includes a public directory profile, even on the free tier. This lets you promote your expertise, not reviews and ratings.

Pricing

Plans for solo engineers.

Start free with the full calculation suite. Step up for the desktop connector, included AI usage, and AI privacy.

Free

Solo engineers — calc tools, compiler & the in-app AI assistant.

Free

Includes:

  • Wood beam, post & bearing calcs
  • Calculation report compiler
  • Design & load criteria
  • In-app AI assistant (pay-as-you-go usage)
  • Not included:Claude desktop (MCP) connector

Pro

Everything in Free, plus the Claude desktop (MCP) connector.

$5
USD per month

Includes:

  • Everything in Free
  • Claude desktop (MCP) connector
  • Not included:1X included AI usage
  • Not included:AI privacy tools (project redaction)

Max

Everything in Pro, plus included AI usage & AI privacy.

$25
USD per month

Includes:

  • Everything in Pro
  • 1X included AI usage
  • Discounted additional AI usage (about 17% compared to Pro)
  • AI privacy (project identity redaction)

Prices in USD. Billed monthly via Stripe. Extra AI usage may be purchased separately.

FAQ

Common questions from engineers.

Join the Waitlist

clearspan is launching soon. Be the first to know.